Pasay 360 Reclamation
Envisioned as a residential and commercial attractor with various business and community service opportunities, the new city development aspires to create an indoor/outdoor experience, connecting the future world-class Waterfront of Manila with SM Mall of Asia through Central Park Lamdmarks.
The mixed use development project in Manila Bay is a planned integrated community considered to occupy three reclaimed islands contained of island A (64.7 ha), Island B (184.8 ha), and Island C (146.4 ha).
The planned development is adjacent to a highly developed onshore area which is accessible via Metro Manila’s major road networks, transport hubs, and seaports.
Meinhardt was appointed to provide a sustainable, Smart and Integrated Infrastructure Master Plan for Concept and Detail Master Plan design stages.
Integrated Infrastructure Design Scope includes:
- Transport and Mobility Planning
- Sustainability
- Energy and District Cooling
- ICT & Smart System
- Landscape Planning
- Signage and Wayfinding
- Lighting
- Wet Utilities
- Environment Assessment Study